Logistics Megahub Substation
Twin 20 MVA primary substation, 11 kV ring distribution and arc-flash study for a 110,000 m² automated distribution centre with 12 MW of automated MHE load.
Resilient power systems from substation to socket.
End-to-end consultancy on medium- and low-voltage electrical infrastructure — from utility connection studies and substation design to internal distribution networks, protection coordination and arc-flash analysis.
Each engagement is shaped to scope, but these are the workstreams we run most often.
Load flow, short-circuit, harmonic and arc-flash studies using ETAP and DIgSILENT — sized for actual demand, not rules of thumb.
Specification, tender support and commissioning oversight for unit substations, ring-main units and MV switchgear.
Main distribution boards, sub-mains, cable routing and earthing/lightning protection per IEC 60364 and BS 7671.
Genset sizing, fuel-day calculations, UPS topology selection and synchronisation strategies for mission-critical loads.
The deliverables our clients tell us made the engagement worth its fee.
Twin 20 MVA primary substation, 11 kV ring distribution and arc-flash study for a 110,000 m² automated distribution centre with 12 MW of automated MHE load.
Power-train design review for a 48 MW IT-load campus — 2N topology, 132/22 kV interconnection studies, and a comprehensive arc-flash and protection coordination programme.
N+1 standby generation, UPS architecture upgrade and clinical-load segregation programme — zero unplanned downtime since commissioning.
Tell us the brief. We'll come back with an honest read on scope, fee and timeline within two working days — usually the same day.
NDA in 24h · written scope in 5 days · no calls required